0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Temburong Bridge, Brunei – CC3 Navigation Bridges and Associated Viaducts

 Temburong Bridge, Brunei – CC3 Navigation Bridges and Associated Viaducts
Auteur(s): , , , ,
Présenté pendant IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, publié dans , pp. 2046-2053
DOI: 10.2749/222137815818359591
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.08 MB

The new 30 km Cadangan Projek Jambatan Temburong (Temburong Bridge Project) in Brunei will connect the relatively isolated district of Temburong with the more developed Brunei-Muara district. The p...
Lire plus

Détails bibliographiques

Auteur(s): (Arup, London, UK)
(Arup, London, UK)
(Arup, London, UK)
(Arup, Hong Kong)
(Arup, Hong Kong)
(Arup, Hong Kong)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Publié dans:
Page(s): 2046-2053 Nombre total de pages (du PDF): 8
Page(s): 2046-2053
Nombre total de pages (du PDF): 8
Année: 2015
DOI: 10.2749/222137815818359591
Abstrait:

The new 30 km Cadangan Projek Jambatan Temburong (Temburong Bridge Project) in Brunei will connect the relatively isolated district of Temburong with the more developed Brunei-Muara district. The project is procured under several different construction contracts. Contract CC3 involves construction of 2 cable stayed bridges over cross navigation channels within Brunei Bay and connecting structures at the Brunei-Muara shoreline.

Despite the differences in span arrangements and deck widths, the 2 concrete deck cable stayed bridges adopt similar details which not only provides a unified theme to the crossing, but also facilitated efficient design methods and construction planning. The towers adopt Islamic architectural principles by incorporating pointed arch shapes and symbolising the physical connection between the four districts of Brunei.

Precast segmental connecting bridges carry the main alignment through towards the Mentiri ridge in Brunei-Muara, whilst on and off ramps connect down to the existing shoreline road.

Construction planning is well advanced for the cable stayed bridges and the connecting structures.

Ouvrages et projets