William Leung
- (2018): Temburong Link – design of cable stayed bridges against extreme loading conditions. Présenté pendant: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018.
- (2016): Temburong Bridge, Brunei – Design of CC1 Tunnels and Bridges in Mentiri. Présenté pendant: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016.
- (2015): Temburong Bridge, Brunei – CC3 Navigation Bridges and Associated Viaducts. Présenté pendant: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015.