0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Innovation in the design and construction of Temburong Bridge, Brunei

 Innovation in the design and construction of Temburong Bridge, Brunei
Auteur(s): , ,
Présenté pendant IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023, publié dans , pp. 445-452
DOI: 10.2749/newdelhi.2023.0445
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 1.05 MB

The 27km long Sultan Haji Omar Ali Saifuddien Bridge in Brunei (known as Temburong Bridge) is the longest bridge in Southeast Asia. The Temburong district was isolated from the rest of Brunei by th...
Lire plus

Détails bibliographiques

Auteur(s): (Associate Director, Arup, London)
(Arup Fellow and Director, Arup, Hong Kong)
(Associate, Arup, Hong Kong)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023
Publié dans:
Page(s): 445-452 Nombre total de pages (du PDF): 8
Page(s): 445-452
Nombre total de pages (du PDF): 8
DOI: 10.2749/newdelhi.2023.0445
Abstrait:

The 27km long Sultan Haji Omar Ali Saifuddien Bridge in Brunei (known as Temburong Bridge) is the longest bridge in Southeast Asia. The Temburong district was isolated from the rest of Brunei by the Malaysian state of Sarawak since 1890. The new bridge connects the district with the more developed Brunei-Muara district, improving connectivity and accessibility to goods and services, facilitating economic development and provides a 24-hour physical link, eliminating the need to go through two Malaysian borders, reducing journey time from 2 hours to 30 minutes.

The bridge was procured as a traditional engineer-design arrangement under various construction contracts. The bridge includes a 14km long marine viaduct across Brunei Bay, two concrete deck cable stayed bridges and a 12km long swamp forest viaduct. This bridge was opened early in 2020 to allow residents to travel to/from Temburong without crossing the Malaysian borders which were shut due to COVID. This paper focus on the innovation of the design and construction of the bridge and discuss the values they bring.

Mots-clé:
viaducs Ponts à haubans

Ouvrages et projets