Alberto Carlucci
- Reliability-based Fire Protection of Structural Cables due to Deck Fires on Cable Supported Bridges. In: Structural Engineering International, v. 33, n. 4 (October 2023). (2023):
- (2018): Temburong Link – design of cable stayed bridges against extreme loading conditions. Presented at: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018.
- (2014): Temburong Bridge, Brunei - Design of two cable stayed bridges. Presented at: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014.
- (2016): An innovative methodology to determine the partial load factor for prestressing in cable supported bridges. Presented at: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016.
- (2015): Temburong Bridge, Brunei – CC3 Navigation Bridges and Associated Viaducts. Presented at: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015.
- Temburong Bridge, Brunei - Design of two cable stayed bridges. In: Bautechnik, v. 92, n. 3 (March 2015). (2015):
- Integrating Security and Aesthetics in a Railway Environment. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):