0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Rangasamy, Veerakumar / Yang, Jyh-Bin (2024): The convergence of BIM, AI and IoT: Reshaping the future of prefabricated construction. In: Journal of Building Engineering, v. 84 (May 2024).

    https://doi.org/10.1016/j.jobe.2024.108606

  2. Yang, Jyh-Bin / Chen, Ying-Fu: S-curve adjustment approaches for a force majeure event: COVID-19 as an example. In: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-03-2023-0303

  3. Yang, Jyh-Bin / Lai, Tzu-Hua: Selecting EVM, ESM and EDM(t) for managing construction project schedule. In: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-02-2023-0115

  4. Zhou, Yijun / Yang, Yu / Yang, Jyh-Bin (2019): Barriers to BIM implementation strategies in China. In: Engineering, Construction and Architectural Management, v. 26, n. 3 (April 2019).

    https://doi.org/10.1108/ecam-04-2018-0158

  5. Yang, Jyh-Bin / Peng, Sheng-Chi (2008): Development of a customer satisfaction evaluation model for construction project management. In: Building and Environment, v. 43, n. 4 (April 2008).

    https://doi.org/10.1016/j.buildenv.2006.07.044

  6. Yang, Jyh-Bin / Kao, Chih-Kuei (2009): Review of Delay Analysis Methods: A Process-Based Comparison. In: The Open Construction and Building Technology Journal, v. 3, n. 1 (December 2009).

    https://doi.org/10.2174/1874836800903010081

  7. Yang, Jyh-Bin (2017): Reviewing Construction Schedule Float Management. In: The Open Construction and Building Technology Journal, v. 11, n. 1 (December 2017).

    https://doi.org/10.2174/1874836801711010001

  8. Yang, Jyh-Bin / Yu, Wen-der / Tseng, Judy C. R. / Chang, Chia-Shin / Chang, Pei-Lun / Wu, Ji-wei (2014): Benefit Analysis of Knowledge Management System for Engineering Consulting Firms. In: Journal of Management in Engineering (ASCE), v. 30, n. 4 (July 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000221

  9. Yang, Jyh-Bin / Wang, Han-Hsiang / Wang, Wei-Chih / Ma, Shin-Min (2016): Using Data Envelopment Analysis To Support Best-value Contractor Selection. In: Journal of Civil Engineering and Management, v. 22, n. 2 (March 2016).

    https://doi.org/10.3846/13923730.2014.897984

  10. Tsai, Ming-Kuan / Yang, Jyh-Bin / Yau, Nie-Jia (2013): Developing Computer-based Schedule Delay Analysis Methods Based on Information Flow Analysis: A Case Study. In: Journal of Civil Engineering and Management, v. 19, n. 6 (December 2013).

    https://doi.org/10.3846/13923730.2013.801901

  11. Yang, Jyh-Bin / Chou, Hung-Yu (2019): Subjective benefit evaluation model for immature BIM-enabled stakeholders. In: Automation in Construction, v. 106 (October 2019).

    https://doi.org/10.1016/j.autcon.2019.102908

  12. Yang, Jyh-Bin / Huang, Kuei-Mei / Lee, Chang-Hung / Chiu, Chui-Te (2014): Incorporating lost productivity calculation into delay analysis for construction projects. In: KSCE Journal of Civil Engineering, v. 18, n. 2 (January 2014).

    https://doi.org/10.1007/s12205-014-0128-8

  13. Yang, Jyh-Bin / Yin, Pi-Chung (2009): Isolated Collapsed But-For Delay Analysis Methodology. In: Journal of Construction Engineering and Management, v. 135, n. 7 (July 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000016

  14. Yau, Nie-Jia / Yang, Jyh-Bin (1998): Case-Based Reasoning in Construction Management. In: Computer-Aided Civil and Infrastructure Engineering, v. 13, n. 2 (March 1998).

    https://doi.org/10.1111/0885-9507.00094

  15. Yau, Nie-Jia / Yang, Jyh-Bin (1998): Applying case-based reasoning technique to retaining wall selection. In: Automation in Construction, v. 7, n. 4 (May 1998).

    https://doi.org/10.1016/s0926-5805(97)00072-1

  16. Yu, Wen-der / Yang, Jyh-Bin / Tseng, Judy C. R. / Liu, Shen-Jung / Wu, Ji-wei (2010): Proactive problem-solver for construction. In: Automation in Construction, v. 19, n. 6 (October 2010).

    https://doi.org/10.1016/j.autcon.2010.05.003

  17. Tsai, Ming-Kuan / Yang, Jyh-Bin / Lin, Chang-Yu (2007): Integrating wireless and speech technologies for synchronous on-site data collection. In: Automation in Construction, v. 16, n. 3 (May 2007).

    https://doi.org/10.1016/j.autcon.2006.07.007

  18. Tsai, Ming-Kuan / Yang, Jyh-Bin / Lin, Chang-Yu (2007): Synchronization-based model for improving on-site data collection performance. In: Automation in Construction, v. 16, n. 3 (May 2007).

    https://doi.org/10.1016/j.autcon.2006.07.001

  19. Wang, Wei-Chih / Yang, Jyh-Bin (2005): Applications of electronically facilitated bidding model to preventing construction disputes. In: Automation in Construction, v. 14, n. 5 (October 2005).

    https://doi.org/10.1016/j.autcon.2005.01.001

  20. Wu, Ji-wei / Tseng, Judy C. R. / Yu, Wen-der / Yang, Jyh-Bin / Lee, Shun-Min / Tsai, Wen-Nung (2012): An integrated proactive knowledge management model for enhancing engineering services. In: Automation in Construction, v. 24 (July 2012).

    https://doi.org/10.1016/j.autcon.2012.02.006

  21. Yang, Jyh-Bin (2007): Developing a knowledge map for construction scheduling using a novel approach. In: Automation in Construction, v. 16, n. 6 (September 2007).

    https://doi.org/10.1016/j.autcon.2007.02.005

  22. Yang, Jyh-Bin / Wu, Chih-Tes / Tsai, Chiang-Huai (2007): Selection of an ERP system for a construction firm in Taiwan: A case study. In: Automation in Construction, v. 16, n. 6 (September 2007).

    https://doi.org/10.1016/j.autcon.2007.02.001

  23. Yang, Jyh-Bin / Tsai, Ming-Kuan (2011): Computerizing ICBF Method for Schedule Delay Analysis. In: Journal of Construction Engineering and Management, v. 137, n. 8 (August 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000338

  24. Yau, Nie-Jia / Yang, Jyh-Bin / Hsieh, Ting-Ya (1999): Inducing rules for selecting retaining wall systems. In: Construction Management and Economics, v. 17, n. 1 (January 1999).

    https://doi.org/10.1080/014461999371853

  25. Yang, Jyh-Bin / Ou, Shen-Fen (2008): Using structural equation modeling to analyze relationships among key causes of delay in construction. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 4 (April 2008).

    https://doi.org/10.1139/l07-101

  26. Yang, Jyh-Bin / Wei, Pei-Rei (2010): Causes of Delay in the Planning and Design Phases for Construction Projects. In: Journal of Architectural Engineering (ASCE), v. 16, n. 2 (June 2010).

    https://doi.org/10.1061/(asce)1076-0431(2010)16:2(80)

  27. Yang, Jyh-Bin / Chou, Hung-Yu (2018): Mixed approach to government BIM implementation policy: An empirical study of Taiwan. In: Journal of Building Engineering, v. 20 (November 2018).

    https://doi.org/10.1016/j.jobe.2018.08.007

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine