0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Developing a knowledge map for construction scheduling using a novel approach

Author(s):
Medium: journal article
Language(s): English
Published in: Automation in Construction, , n. 6, v. 16
Page(s): 806-815
DOI: 10.1016/j.autcon.2007.02.005
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.autcon.2007.02.005.
  • About this
    data sheet
  • Reference-ID
    10189725
  • Published on:
    10/12/2018
  • Last updated on:
    10/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine