0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Vo, Huy Minh / Yang, Jyh-Bin / Rangasamy, Veerakumar: A comprehensive review of delay analysis techniques for solving concurrent delays. Dans: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-10-2023-1022

  2. Tseng, Chun-Chieh / Yang, Jyh-Bin (2024): The Benefit Evaluation Framework of Using Performance-based Contracting in Urban Road Maintenance. Dans: Journal of Civil Engineering and Management, v. 30, n. 2 (6 février 2024).

    https://doi.org/10.3846/jcem.2024.20491

  3. Rangasamy, Veerakumar / Yang, Jyh-Bin (2024): The convergence of BIM, AI and IoT: Reshaping the future of prefabricated construction. Dans: Journal of Building Engineering, v. 84 (mai 2024).

    https://doi.org/10.1016/j.jobe.2024.108606

  4. Yang, Jyh-Bin / Chen, Ying-Fu: S-curve adjustment approaches for a force majeure event: COVID-19 as an example. Dans: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-03-2023-0303

  5. Yang, Jyh-Bin / Lai, Tzu-Hua: Selecting EVM, ESM and EDM(t) for managing construction project schedule. Dans: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-02-2023-0115

  6. Zhou, Yijun / Yang, Yu / Yang, Jyh-Bin (2019): Barriers to BIM implementation strategies in China. Dans: Engineering, Construction and Architectural Management, v. 26, n. 3 (avril 2019).

    https://doi.org/10.1108/ecam-04-2018-0158

  7. Yang, Jyh-Bin / Peng, Sheng-Chi (2008): Development of a customer satisfaction evaluation model for construction project management. Dans: Building and Environment, v. 43, n. 4 (avril 2008).

    https://doi.org/10.1016/j.buildenv.2006.07.044

  8. Yang, Jyh-Bin / Kao, Chih-Kuei (2009): Review of Delay Analysis Methods: A Process-Based Comparison. Dans: The Open Construction and Building Technology Journal, v. 3, n. 1 (décembre 2009).

    https://doi.org/10.2174/1874836800903010081

  9. Yang, Jyh-Bin (2017): Reviewing Construction Schedule Float Management. Dans: The Open Construction and Building Technology Journal, v. 11, n. 1 (décembre 2017).

    https://doi.org/10.2174/1874836801711010001

  10. Yang, Jyh-Bin / Yu, Wen-der / Tseng, Judy C. R. / Chang, Chia-Shin / Chang, Pei-Lun / Wu, Ji-wei (2014): Benefit Analysis of Knowledge Management System for Engineering Consulting Firms. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 4 (juillet 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000221

  11. Yang, Jyh-Bin / Wang, Han-Hsiang / Wang, Wei-Chih / Ma, Shin-Min (2016): Using Data Envelopment Analysis To Support Best-value Contractor Selection. Dans: Journal of Civil Engineering and Management, v. 22, n. 2 (mars 2016).

    https://doi.org/10.3846/13923730.2014.897984

  12. Tsai, Ming-Kuan / Yang, Jyh-Bin / Yau, Nie-Jia (2013): Developing Computer-based Schedule Delay Analysis Methods Based on Information Flow Analysis: A Case Study. Dans: Journal of Civil Engineering and Management, v. 19, n. 6 (décembre 2013).

    https://doi.org/10.3846/13923730.2013.801901

  13. Yang, Jyh-Bin / Chou, Hung-Yu (2019): Subjective benefit evaluation model for immature BIM-enabled stakeholders. Dans: Automation in Construction, v. 106 (octobre 2019).

    https://doi.org/10.1016/j.autcon.2019.102908

  14. Yang, Jyh-Bin / Huang, Kuei-Mei / Lee, Chang-Hung / Chiu, Chui-Te (2014): Incorporating lost productivity calculation into delay analysis for construction projects. Dans: KSCE Journal of Civil Engineering, v. 18, n. 2 (janvier 2014).

    https://doi.org/10.1007/s12205-014-0128-8

  15. Yang, Jyh-Bin / Yin, Pi-Chung (2009): Isolated Collapsed But-For Delay Analysis Methodology. Dans: Journal of Construction Engineering and Management, v. 135, n. 7 (juillet 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000016

  16. Yau, Nie-Jia / Yang, Jyh-Bin (1998): Case-Based Reasoning in Construction Management. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 13, n. 2 (mars 1998).

    https://doi.org/10.1111/0885-9507.00094

  17. Yau, Nie-Jia / Yang, Jyh-Bin (1998): Applying case-based reasoning technique to retaining wall selection. Dans: Automation in Construction, v. 7, n. 4 (mai 1998).

    https://doi.org/10.1016/s0926-5805(97)00072-1

  18. Yu, Wen-der / Yang, Jyh-Bin / Tseng, Judy C. R. / Liu, Shen-Jung / Wu, Ji-wei (2010): Proactive problem-solver for construction. Dans: Automation in Construction, v. 19, n. 6 (octobre 2010).

    https://doi.org/10.1016/j.autcon.2010.05.003

  19. Tsai, Ming-Kuan / Yang, Jyh-Bin / Lin, Chang-Yu (2007): Integrating wireless and speech technologies for synchronous on-site data collection. Dans: Automation in Construction, v. 16, n. 3 (mai 2007).

    https://doi.org/10.1016/j.autcon.2006.07.007

  20. Tsai, Ming-Kuan / Yang, Jyh-Bin / Lin, Chang-Yu (2007): Synchronization-based model for improving on-site data collection performance. Dans: Automation in Construction, v. 16, n. 3 (mai 2007).

    https://doi.org/10.1016/j.autcon.2006.07.001

  21. Wang, Wei-Chih / Yang, Jyh-Bin (2005): Applications of electronically facilitated bidding model to preventing construction disputes. Dans: Automation in Construction, v. 14, n. 5 (octobre 2005).

    https://doi.org/10.1016/j.autcon.2005.01.001

  22. Wu, Ji-wei / Tseng, Judy C. R. / Yu, Wen-der / Yang, Jyh-Bin / Lee, Shun-Min / Tsai, Wen-Nung (2012): An integrated proactive knowledge management model for enhancing engineering services. Dans: Automation in Construction, v. 24 (juillet 2012).

    https://doi.org/10.1016/j.autcon.2012.02.006

  23. Yang, Jyh-Bin (2007): Developing a knowledge map for construction scheduling using a novel approach. Dans: Automation in Construction, v. 16, n. 6 (septembre 2007).

    https://doi.org/10.1016/j.autcon.2007.02.005

  24. Yang, Jyh-Bin / Wu, Chih-Tes / Tsai, Chiang-Huai (2007): Selection of an ERP system for a construction firm in Taiwan: A case study. Dans: Automation in Construction, v. 16, n. 6 (septembre 2007).

    https://doi.org/10.1016/j.autcon.2007.02.001

  25. Yang, Jyh-Bin / Tsai, Ming-Kuan (2011): Computerizing ICBF Method for Schedule Delay Analysis. Dans: Journal of Construction Engineering and Management, v. 137, n. 8 (août 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000338

  26. Yau, Nie-Jia / Yang, Jyh-Bin / Hsieh, Ting-Ya (1999): Inducing rules for selecting retaining wall systems. Dans: Construction Management and Economics, v. 17, n. 1 (janvier 1999).

    https://doi.org/10.1080/014461999371853

  27. Yang, Jyh-Bin / Ou, Shen-Fen (2008): Using structural equation modeling to analyze relationships among key causes of delay in construction. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 4 (avril 2008).

    https://doi.org/10.1139/l07-101

  28. Yang, Jyh-Bin / Wei, Pei-Rei (2010): Causes of Delay in the Planning and Design Phases for Construction Projects. Dans: Journal of Architectural Engineering (ASCE), v. 16, n. 2 (juin 2010).

    https://doi.org/10.1061/(asce)1076-0431(2010)16:2(80)

  29. Yang, Jyh-Bin / Chou, Hung-Yu (2018): Mixed approach to government BIM implementation policy: An empirical study of Taiwan. Dans: Journal of Building Engineering, v. 20 (novembre 2018).

    https://doi.org/10.1016/j.jobe.2018.08.007

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine