Vo, Huy Minh / Yang, Jyh-Bin / Rangasamy, Veerakumar: A comprehensive review of delay analysis techniques for solving concurrent delays. In: Engineering, Construction and Architectural Management.
https://doi.org/10.1108/ecam-10-2023-1022
-
Tseng, Chun-Chieh / Yang, Jyh-Bin (2024): The Benefit Evaluation Framework of Using Performance-based Contracting in Urban Road Maintenance. In: Journal of Civil Engineering and Management, v. 30, n. 2 (6 Februar 2024).
https://doi.org/10.3846/jcem.2024.20491
-
Rangasamy, Veerakumar / Yang, Jyh-Bin (2024): The convergence of BIM, AI and IoT: Reshaping the future of prefabricated construction. In: Journal of Building Engineering, v. 84 (Mai 2024).
https://doi.org/10.1016/j.jobe.2024.108606
-
Yang, Jyh-Bin / Chen, Ying-Fu: S-curve adjustment approaches for a force majeure event: COVID-19 as an example. In: Engineering, Construction and Architectural Management.
https://doi.org/10.1108/ecam-03-2023-0303
-
Yang, Jyh-Bin / Lai, Tzu-Hua: Selecting EVM, ESM and EDM(t) for managing construction project schedule. In: Engineering, Construction and Architectural Management.
https://doi.org/10.1108/ecam-02-2023-0115
-
Zhou, Yijun / Yang, Yu / Yang, Jyh-Bin (2019): Barriers to BIM implementation strategies in China. In: Engineering, Construction and Architectural Management, v. 26, n. 3 (April 2019).
https://doi.org/10.1108/ecam-04-2018-0158
-
Yang, Jyh-Bin / Peng, Sheng-Chi (2008): Development of a customer satisfaction evaluation model for construction project management. In: Building and Environment, v. 43, n. 4 (April 2008).
https://doi.org/10.1016/j.buildenv.2006.07.044
-
Yang, Jyh-Bin / Kao, Chih-Kuei (2009): Review of Delay Analysis Methods: A Process-Based Comparison. In: The Open Construction and Building Technology Journal, v. 3, n. 1 (Dezember 2009).
https://doi.org/10.2174/1874836800903010081
-
Yang, Jyh-Bin (2017): Reviewing Construction Schedule Float Management. In: The Open Construction and Building Technology Journal, v. 11, n. 1 (Dezember 2017).
https://doi.org/10.2174/1874836801711010001
-
Yang, Jyh-Bin / Yu, Wen-der / Tseng, Judy C. R. / Chang, Chia-Shin / Chang, Pei-Lun / Wu, Ji-wei (2014): Benefit Analysis of Knowledge Management System for Engineering Consulting Firms. In: Journal of Management in Engineering (ASCE), v. 30, n. 4 (Juli 2014).
https://doi.org/10.1061/(asce)me.1943-5479.0000221
-
Yang, Jyh-Bin / Wang, Han-Hsiang / Wang, Wei-Chih / Ma, Shin-Min (2016): Using Data Envelopment Analysis To Support Best-value Contractor Selection. In: Journal of Civil Engineering and Management, v. 22, n. 2 (März 2016).
https://doi.org/10.3846/13923730.2014.897984
-
Tsai, Ming-Kuan / Yang, Jyh-Bin / Yau, Nie-Jia (2013): Developing Computer-based Schedule Delay Analysis Methods Based on Information Flow Analysis: A Case Study. In: Journal of Civil Engineering and Management, v. 19, n. 6 (Dezember 2013).
https://doi.org/10.3846/13923730.2013.801901
-
Yang, Jyh-Bin / Chou, Hung-Yu (2019): Subjective benefit evaluation model for immature BIM-enabled stakeholders. In: Automation in Construction, v. 106 (Oktober 2019).
https://doi.org/10.1016/j.autcon.2019.102908
-
Yang, Jyh-Bin / Huang, Kuei-Mei / Lee, Chang-Hung / Chiu, Chui-Te (2014): Incorporating lost productivity calculation into delay analysis for construction projects. In: KSCE Journal of Civil Engineering, v. 18, n. 2 (Januar 2014).
https://doi.org/10.1007/s12205-014-0128-8
-
Yang, Jyh-Bin / Yin, Pi-Chung (2009): Isolated Collapsed But-For Delay Analysis Methodology. In: Journal of Construction Engineering and Management, v. 135, n. 7 (Juli 2009).
https://doi.org/10.1061/(asce)co.1943-7862.0000016
-
Yau, Nie-Jia / Yang, Jyh-Bin (1998): Case-Based Reasoning in Construction Management. In: Computer-Aided Civil and Infrastructure Engineering, v. 13, n. 2 (März 1998).
https://doi.org/10.1111/0885-9507.00094
-
Yau, Nie-Jia / Yang, Jyh-Bin (1998): Applying case-based reasoning technique to retaining wall selection. In: Automation in Construction, v. 7, n. 4 (Mai 1998).
https://doi.org/10.1016/s0926-5805(97)00072-1
-
Yu, Wen-der / Yang, Jyh-Bin / Tseng, Judy C. R. / Liu, Shen-Jung / Wu, Ji-wei (2010): Proactive problem-solver for construction. In: Automation in Construction, v. 19, n. 6 (Oktober 2010).
https://doi.org/10.1016/j.autcon.2010.05.003
-
Tsai, Ming-Kuan / Yang, Jyh-Bin / Lin, Chang-Yu (2007): Integrating wireless and speech technologies for synchronous on-site data collection. In: Automation in Construction, v. 16, n. 3 (Mai 2007).
https://doi.org/10.1016/j.autcon.2006.07.007
-
Tsai, Ming-Kuan / Yang, Jyh-Bin / Lin, Chang-Yu (2007): Synchronization-based model for improving on-site data collection performance. In: Automation in Construction, v. 16, n. 3 (Mai 2007).
https://doi.org/10.1016/j.autcon.2006.07.001
-
Wang, Wei-Chih / Yang, Jyh-Bin (2005): Applications of electronically facilitated bidding model to preventing construction disputes. In: Automation in Construction, v. 14, n. 5 (Oktober 2005).
https://doi.org/10.1016/j.autcon.2005.01.001
-
Wu, Ji-wei / Tseng, Judy C. R. / Yu, Wen-der / Yang, Jyh-Bin / Lee, Shun-Min / Tsai, Wen-Nung (2012): An integrated proactive knowledge management model for enhancing engineering services. In: Automation in Construction, v. 24 (Juli 2012).
https://doi.org/10.1016/j.autcon.2012.02.006
-
Yang, Jyh-Bin (2007): Developing a knowledge map for construction scheduling using a novel approach. In: Automation in Construction, v. 16, n. 6 (September 2007).
https://doi.org/10.1016/j.autcon.2007.02.005
-
Yang, Jyh-Bin / Wu, Chih-Tes / Tsai, Chiang-Huai (2007): Selection of an ERP system for a construction firm in Taiwan: A case study. In: Automation in Construction, v. 16, n. 6 (September 2007).
https://doi.org/10.1016/j.autcon.2007.02.001
-
Yang, Jyh-Bin / Tsai, Ming-Kuan (2011): Computerizing ICBF Method for Schedule Delay Analysis. In: Journal of Construction Engineering and Management, v. 137, n. 8 (August 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000338
-
Yau, Nie-Jia / Yang, Jyh-Bin / Hsieh, Ting-Ya (1999): Inducing rules for selecting retaining wall systems. In: Construction Management and Economics, v. 17, n. 1 (Januar 1999).
https://doi.org/10.1080/014461999371853
-
Yang, Jyh-Bin / Ou, Shen-Fen (2008): Using structural equation modeling to analyze relationships among key causes of delay in construction. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 4 (April 2008).
https://doi.org/10.1139/l07-101
-
Yang, Jyh-Bin / Wei, Pei-Rei (2010): Causes of Delay in the Planning and Design Phases for Construction Projects. In: Journal of Architectural Engineering (ASCE), v. 16, n. 2 (Juni 2010).
https://doi.org/10.1061/(asce)1076-0431(2010)16:2(80)
-
Yang, Jyh-Bin / Chou, Hung-Yu (2018): Mixed approach to government BIM implementation policy: An empirical study of Taiwan. In: Journal of Building Engineering, v. 20 (November 2018).
https://doi.org/10.1016/j.jobe.2018.08.007