Reviewing Construction Schedule Float Management
Author(s): |
Jyh-Bin Yang
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | The Open Construction and Building Technology Journal, December 2017, n. 1, v. 11 |
Page(s): | 1-13 |
DOI: | 10.2174/1874836801711010001 |
Abstract: |
As the complexity in construction projects increased, simply managing the obtained float values and critical path(s) by the CPM method usually results in more difficult schedule control and, consequently, in incorrect decision making due to non-realistic float values. This study thoroughly reviewed various float types in the literature and professional project management systems, and discussed five managerial essentials and three proactive strategies on mitigating challenging float-related problems based on the perspective of managing schedules by controlling floats. With some comments and suggestions, the outcomes of this study not only improve the knowledge level on schedule management but also provide a better understanding of float management to improve the quality of schedule management. |
Copyright: | © 2017 Jyh-Bin Yang, |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
0.42 MB
- About this
data sheet - Reference-ID
10381111 - Published on:
22/11/2019 - Last updated on:
02/06/2021