0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 21 April 2002
Completion: 25 December 2018
Status: in use

Project Type

Structure: Through truss bridge
Warren type truss bridge
Material: Steel bridge
Construction method: Longitudinal launching
Function / usage: upper deck:
Road bridge
lower deck:
Railroad (railway) bridge

Location

Location: , ,
Crosses:
  • Brahmaputra River
Coordinates: 27° 23' 28.72" N    94° 46' 40.95" E
Coordinates: 27° 25' 28.21" N    94° 44' 37.63" E
Show coordinates on a map

Technical Information

Dimensions

total length 4 940 m
main spans ca. 39 x 125 m
number of spans 41
bearings number 164
lower deck number of tracks 2
track gauge 1 676 mm
upper deck number of lanes 3

Materials

truss steel

Case Studies and Applied Products

Bogibeel Bridge is the second-longest combined railroad/road bridge in Asia

Bogibeel Bridge is the second-longest combined railroad/road bridge in Asia

In 2002, construction work for the largest combined railroad/road bridge in India started. The Bogibeel Bridge owes its name to a secluded village in the tri-border region of India, Myanmar, and China, where ... [more]

Chronology

21 April 2002

Inauguration of the construction by Prime Minister Atal Behari Vajpayee.

Participants

Consulting engineers
Main contractor
Co-contractor
Bearings

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20010013
  • Published on:
    19/08/2003
  • Last updated on:
    21/06/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine