General Information

Beginning of works: 2010
Completion: 2022
Status: under construction

Project Type

Location

km Name
Show coordinates on a map

Technical Information

There currently is no technical data available.

Case Studies and Applied Products

Bad Cannstatt Tunnel – Pit for Smoke Removal Structure

Bad Cannstatt Tunnel – Pit for Smoke Removal Structure

The Bad Cannstatt Tunnel is being advanced within the scope of the major project Stuttgart 21, approval section 1.5, Lot 3. The approx. 3.8 km long railroad tunnel will connect Stuttgart Main Station with the new Neckar Bridge.

[more]
Excavation stabilization for new section of Stuttgart 21

Excavation stabilization for new section of Stuttgart 21

Project Approval Section 1.5 is part of a Stuttgart 21 sub-project, the railway project Stuttgart-Ulm. The section refers to the triangle between the train station in Feuerbach, the train station in Bad Cannstatt and the access to Stuttg ... [more]

Relevant Web Sites

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    10000050
  • Published on:
    15/09/2001
  • Last updated on:
    02/09/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine