General Information
Project Type
Material: |
Steel-reinforced concrete composite bridge |
---|---|
Construction method: |
Longitudinal launching |
Structure: |
Girder bridge with suspended deck |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Function / usage: |
upper deck: Railroad (railway) bridge lower deck: Bicycle and pedestrian bridge |
Location
Location: |
Bad Cannstatt, Stuttgart, Baden-Württemberg, Germany |
---|---|
Part of: | |
Replaces: |
Neckar River Footbridge (1977)
|
Coordinates: | 48° 48' 6.95" N 9° 12' 34.03" E |
Technical Information
Dimensions
width | ca. 24.20 m | |
total length | 345 m | |
span lengths | 27.78 m - 37.0 m - 47.0 m - 78.0 m - 72.0 m - 35.0 m -23.0 m - 25.26 m | |
number of spans | 8 | |
number of tracks | 4 |
Materials
piers |
steel
|
---|---|
deck slab |
reinforced concrete
|
cross beams |
steel
|
main girders |
steel
|
Participants
Owner
Client
Design
Structural engineering
Contractor
Relevant Web Sites
Relevant Publications
- neue Eisenbahnbrücke über den Neckar in Stuttgart - Planung einer besonderen Stahlsegelbrücke. In: Stahlbau, v. 87, n. 7 (July 2018), pp. 718-730. (2018):
- About this
data sheet - Structure-ID
20074307 - Published on:
01/12/2017 - Last updated on:
13/08/2023