0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: February 2013
Completion: December 2021
Status: under construction

Project Type

Structure: Tunnel
Function / usage: Railroad (railway) tunnel

Location

Location: , , ,
Part of:
Coordinates: 48° 47' 5.36" N    9° 10' 49.35" E
Coordinates: 48° 48' 5.79" N    9° 12' 26.49" E
Show coordinates on a map

Technical Information

Dimensions

length 3 507 m
number of tubes 1 - 2

Case Studies and Applied Products

Bad Cannstatt Tunnel – Pit for Smoke Removal Structure

Bad Cannstatt Tunnel – Pit for Smoke Removal Structure

The Bad Cannstatt Tunnel is being advanced within the scope of the major project Stuttgart 21, approval section 1.5, Lot 3. The approx. 3.8 km long railroad tunnel will connect Stuttgart Main Station with the new Neckar Bridge.

[more]

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20074305
  • Published on:
    01/12/2017
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine