Advertisement
Wiesbaden-Schierstein Bridge
General Information
Name in local language: | Rheinbrücke Wiesbaden-Schierstein |
---|---|
Beginning of works: | 11 September 2013 |
Completion: | 2019 |
Status: | in use/under construction |
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
main bridge: Steel bridge approach viaducts: Steel-concrete composite bridge |
Location
Location: |
Wiesbaden, Hesse, Germany Mainz, Rhineland-Palatinate, Germany |
---|---|
Crosses: |
|
Part of: | |
Replaces: |
Rheinbrücke Wiesbaden-Schierstein (1962)
|
Coordinates: | 50° 2' 12.04" N 8° 12' 41.77" E |
Technical Information
Dimensions
total length | 1 280 m | |
span lengths | 46.70 m - 55.00 m - 102.50 m - 205.00 m - 102.50 m - 89.00 m - 102.50 m - 205.00 m - 102.50 m - 70.00 m - 2 x 60.00 m - 52.00 m - 29.84 m | |
deck width | 2 × 21.72 m | |
bridge surface | ca. 54 000 m² | |
number of lanes | 2 × 3 | |
downstream bridge | ||
---|---|---|
total length | 1 285.133 m | |
bridge surface | 27 907 m² | |
upstream bridge | ||
total length | 1 278.776 m | |
bridge surface | 27 769 m² |
Quantities
structural steel | 40 900 t | |
concrete volume | 65 900 m³ | |
volume of earthworks | 40 700 m³ |
Cost
cost of construction | Euro 206 000 000 |
Materials
piers |
reinforced concrete
|
---|---|
deck of main bridge |
steel
|
deck of approach viaducts |
composite steel-reinforced concrete
|
abutments |
reinforced concrete
|
Products, Services & Reports

The Schiersteiner Bridge ranks among the most significant new highway bridge constructions in Germany. The challenge is the enormous structural wei ...
[more]Participants
Owner
Client
Design
Steel connections
Bearings
Expansion joints
Relevant Web Sites
Relevant Publications
- Ersatzneubau der Schiersteiner Brücke. In: Stahlbau, v. 85, n. 5 (May 2016), pp. 360-362. (2016):
- Die neue Rheinbrücke Wiesbaden-Schierstein - Wettbewerb und Entwurf. In: Stahlbau, v. 82, n. 2 (February 2013), pp. 106-121. (2013):
- The New Wiesbaden-Schierstein Bridge – 50 Years of Steel Construction. Presented at: Engineering for Progress, Nature and People, IABSE Symposium, 3-5 September 2014, Madrid, Spain, pp. 2089-2096. (2014):
- Reaktionen auf die Vollsperrung der Schiersteiner Brücke auf der A643. In: Bautechnik, v. 92, n. 3 (March 2015), pp. 237.
- Suche nach der geeigneten Lösung. Zu den Ergebnissen von zwei Realisierungswettbewerben. In: [ Umrisse ], v. 8, n. 4 ( 2008), pp. 18. (2008):
- About this
data sheet - Structure-ID
20043396 - Date created
04/02/2009 - Last Update
13/09/2018