0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Rheinbrücke Wiesbaden-Schierstein
Beginning of works: 11 September 2013
Completion: 2019
Status: in use/under construction

Project Type

Location

Location: , ,
, ,
Crosses:
  • Rhine River
Part of:
Replaces: Rheinbrücke Wiesbaden-Schierstein (1962)
Coordinates: 50° 2' 12.04" N    8° 12' 41.77" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 280 m
span lengths 46.70 m - 55.00 m - 102.50 m - 205.00 m - 102.50 m - 89.00 m - 102.50 m - 205.00 m - 102.50 m - 70.00 m - 2 x 60.00 m - 52.00 m - 29.84 m
deck width 2 x 21.72 m
number of spans 14
bridge surface ca. 54 000 m²
number of lanes 2 x 3
downstream bridge
total length 1 285.133 m
bridge surface 27 907 m²
upstream bridge
total length 1 278.776 m
bridge surface 27 769 m²

Quantities

structural steel 40 900 t
concrete volume 65 900 m³
volume of earthworks 40 700 m³

Cost

cost of construction Euro 206 000 000

Materials

piers reinforced concrete
deck of main bridge steel
deck of approach viaducts composite steel-reinforced concrete
abutments reinforced concrete

Case Studies and Applied Products

New construction of the Schiersteiner Bridge: spherical bearings for 6,000 t of structural load

New construction of the Schiersteiner Bridge: spherical bearings for 6,000 t of structural load

The Schiersteiner Bridge ranks among the most significant new highway bridge constructions in Germany. The challenge is the enormous structural weight causing structural loads of up to 6,000 t and large rota ... [more]

Relevant Web Sites

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20043396
  • Published on:
    04/02/2009
  • Last updated on:
    13/09/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine