General Information
Completion: | 1982 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Precast segmental construction with temporary cable-stays |
Material: |
Prestressed concrete bridge |
Location
Location: |
Nice, Alpes-Maritimes (06), Provence-Alpes-Côte d'Azur, France |
---|---|
Carries: |
|
Part of: | |
Next to: |
Viaduc du Vallon des Fleurs (1976)
|
Coordinates: | 43° 43' 54.63" N 7° 16' 17.42" E |
Technical Information
Dimensions
total length | 110.50 m | |
span lengths | 31.25 m - 48 m - 31.25 m | |
number of spans | 3 | |
pier height | 19 m | |
deck | deck depth | 2.50 m |
deck width | 10.4 m | |
average volume | 6.72 m³ / m (lin.) |
Quantities
deck | prestressing steel | 57.9 kg/m² |
reinforcing steel | 145.5 kg/m² |
Materials
deck |
precast prestressed concrete
|
---|
Chronology
1982 | Opened to traffic. |
---|
Participants
Owner
Client
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- A8 - Viaduc du Vallon des Fleurs (doublement contournement de Nice). In: Bulletin annuel AFPC ( 1980- 1982), pp. 203-208.
- La construction à l'avancement par haubanage provisoire. Presented at: Technique française du Béton Précontraint, IXe Congrès de la FIP Stockholm 1982, pp. 212-219. (1982):
- Viaduc du Vallon des Fleurs (doublement du contournement de l'A8 à Nice). Presented at: Technique française du Béton Précontraint, IXe Congrès de la FIP Stockholm 1982, pp. 69.
- Viaducs autoroutiers en sites difficiles: contraintes de conception et de réalisation (A40 et A8). Presented at: Technique française du Béton Précontraint, IXe Congrès de la FIP Stockholm 1982, pp. 233-241. (1982):
- About this
data sheet - Structure-ID
20007596 - Published on:
05/01/2003 - Last updated on:
05/02/2016