General Information
Completion: | 1976 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Location
Location: |
Nice, Alpes-Maritimes (06), Provence-Alpes-Côte d'Azur, France |
---|---|
Carries: |
|
Part of: | |
Next to: |
Viaduc du Vallon des Fleurs (1982)
|
Coordinates: | 43° 43' 55.52" N 7° 16' 17.35" E |
Technical Information
Dimensions
total length | 110.50 m | |
span lengths | 31.49 m - 47.52 m - 31.49 m | |
number of spans | 3 | |
pier height | 19 m | |
deck | deck depth | 2.50 m |
deck width | 12.5 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Owner
Client
Main contractor
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Viaducs du contournement autoroutier de Nice. Presented at: La technique française du béton. 8ème congrès FIP. Londres 1978 (AFB/AFGC), pp. 172-180. (1978):
- About this
data sheet - Structure-ID
20004638 - Published on:
22/08/2002 - Last updated on:
05/02/2016