General Information
Completion: | 1985 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Precast segmental construction |
Material: |
Prestressed concrete bridge |
Location
Location: |
Nantua, Ain (01), Auvergne-Rhône-Alpes, France |
---|---|
Carries: |
|
Part of: |
|
Next to: |
Viaduc des Neyrolles (1996)
|
Near: |
Nantua Viaduct (1988)
|
Coordinates: | 46° 8' 40.31" N 5° 37' 53.40" E |
Technical Information
Dimensions
total length | 782 m |
Quantities
number of precast hollow box elements | 331 |
Materials
deck |
precast prestressed concrete
|
---|
Case Studies and Applied Products
TENSA®MODULAR LR & LR-LS – Modular expansion joints
Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions and rotations around all 3 axes.
[more]Participants
Initial construction
Owner
Client
Architecture
- Maurice Novarina (architect)
Contractor
Renovation (2011)
Expansion joints
Relevant Web Sites
Relevant Publications
- Analyse de l'insertion du viaduc de Nantua et des Neyrolles dans le paysage. In: Formes et Structures (1st Quarter 1994), pp. 17. (1994):
- Autoroute A40. Construction des viaducs de Nantua et des Neyrolles. In: Travaux, n. 606 (January 1986), pp. 20-34. (1986):
- Les grands ponts du monde: Ponts remarquables d'Europe. Brissaud, Poitiers (France), pp. 250. (1990):
- Ponts en béton précontraint construits par encorbellements successifs. Guide de conception. SETRA, Bagneux (France), 2003.
- Trois exemples d'articulation en travée sur des ponts construits par encorbellements symétriques. A40: viaduc de Bellegarde, viaduc de Nantua, viaduc des Neyrolles. In: Ouvrages d'art, n. 7 (January 1990), pp. 7-9. (1990):
- About this
data sheet - Structure-ID
20007398 - Published on:
03/01/2003 - Last updated on:
05/02/2016