General Information
Completion: | 1996 |
---|---|
Status: | in use |
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Precast segmental construction with temporary cable-stays |
Material: |
Prestressed concrete bridge |
Location
Location: |
Nantua, Ain (01), Auvergne-Rhône-Alpes, France |
---|---|
Carries: |
|
Part of: |
|
Next to: |
Viaduc des Neyrolles (1985)
|
Coordinates: | 46° 8' 39.69" N 5° 37' 53.70" E |
Technical Information
Dimensions
standard span lengths | ca. 50 m |
Quantities
number of precast hollow box elements | 409 |
Materials
deck |
precast prestressed concrete
|
---|
Participants
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Analyse de l'insertion du doublement des viaducs de Nantua et des Neyrolles dans le paysage. In: Travaux, n. 699 (June 1994), pp. 65-66. (1994):
- Analyse de l'insertion du viaduc de Nantua et des Neyrolles dans le paysage. In: Formes et Structures (1st Quarter 1994), pp. 17. (1994):
- Le déroulement des travaux des viaducs de Nantua et des Neyrolles. In: Travaux, n. 699 (June 1994), pp. 66-73. (1994):
- Deux viaducs pour un doublement. A40 - Le doublement des viaducs de Nantua et des Neyrolles. In: Travaux, n. 699 (June 1994), pp. 61-65. (1994):
- Ponts en béton précontraint construits par encorbellements successifs. Guide de conception. SETRA, Bagneux (France), 2003.
- About this
data sheet - Structure-ID
20007399 - Published on:
03/01/2003 - Last updated on:
05/02/2016