General Information
Other name(s): | Viaduc de Nantua |
---|---|
Completion: | 1988 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Nantua, Ain (01), Auvergne-Rhône-Alpes, France |
---|---|
Carries: |
|
Part of: |
|
Next to: |
Nantua Viaduct (1996)
|
Near: |
Chamoise Tunnel (1986)
Viaduc des Neyrolles (1985) |
Coordinates: | 46° 8' 33.17" N 5° 37' 3.85" E |
Technical Information
Dimensions
main span | 124 m | |
total length | 1 003 m | |
pier height | 86 m | |
deck | deck depth | 3 - 8.45 m |
Materials
deck |
prestressed concrete
|
---|
Case Studies and Applied Products
TENSA®MODULAR LR & LR-LS – Modular expansion joints
Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions and rotations around all 3 axes.
[more]Participants
Initial construction (1988)
Design
Architecture
- Maurice Novarina (architect)
Construction
Renovation (2011)
Expansion joints
Relevant Web Sites
Relevant Publications
- Analyse de l'insertion du doublement des viaducs de Nantua et des Neyrolles dans le paysage. In: Travaux, n. 699 (June 1994), pp. 65-66. (1994):
- Analyse de l'insertion du viaduc de Nantua et des Neyrolles dans le paysage. In: Formes et Structures (1st Quarter 1994), pp. 17. (1994):
- Autoroute A40. Construction des viaducs de Nantua et des Neyrolles. In: Travaux, n. 606 (January 1986), pp. 20-34. (1986):
- Le déroulement des travaux des viaducs de Nantua et des Neyrolles. In: Travaux, n. 699 (June 1994), pp. 66-73. (1994):
- Deux viaducs pour un doublement. A40 - Le doublement des viaducs de Nantua et des Neyrolles. In: Travaux, n. 699 (June 1994), pp. 61-65. (1994):