General Information
Completion: | 1985 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge |
Location
Location: |
La Trinité, Alpes-Maritimes (06), Provence-Alpes-Côte d'Azur, France |
---|---|
Carries: |
|
Part of: | |
Next to: |
Viaduc de la Nuec (1978)
|
Coordinates: | 43° 44' 3.34" N 7° 19' 2.83" E |
Technical Information
Dimensions
total length | 303.5 m | |
span lengths | 25 m - 35 m - 4 x 51 m - 39.5 m | |
number of spans | 7 | |
pier height | 51 m | |
web thickness | 0.40 - 0.69 m | |
deck | deck depth | 3.0 m |
deck width | 11.40 m |
Quantities
concrete volume | 2 580 m³ | |
prestressing steel | 125 t | |
reinforcing steel | 415 t |
Materials
deck |
prestressed concrete
|
---|
Participants
Owner
Client
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- A8 - Doublement du viaduc de la Nuec. In: Travaux, n. 606 (January 1986), pp. 88.
- Doublement des viaducs de l'Oli et de la Nuec (France). In: IABSE Structures, v. 7 ( 1983).
- About this
data sheet - Structure-ID
20007602 - Published on:
05/01/2003 - Last updated on:
30/07/2019