General Information
Completion: | 1978 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching with temporary cable-stays |
Material: |
Prestressed concrete bridge |
Location
Location: |
La Trinité, Alpes-Maritimes (06), Provence-Alpes-Côte d'Azur, France |
---|---|
Carries: |
|
Part of: | |
Next to: |
Viaduc de la Nuec (1985)
|
Coordinates: | 43° 44' 3.75" N 7° 19' 2.72" E |
Technical Information
Dimensions
total length | 246 m | |
span lengths | 6 x 41 m | |
number of spans | 6 | |
pier height | 53 m | |
on-center distance between girders | 6.35 m | |
girder width | 0.85 m | |
deck | deck depth | 3.10 m |
deck width | 12.40 m | |
average depth | 0.82 m |
Quantities
deck | prestressing steel | 34 kg/m² |
reinforcing steel | 74 kg/m² |
Materials
deck |
prestressed concrete
|
---|
Participants
Owner
Client
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- A8 - Viaduc de la Nuec. In: Bulletin annuel AFPC ( 1978- 1979), pp. 115-121.
- Evolution, récents développements et perspectives d'avenir des ponts poussés. Presented at: La technique française du béton. 8ème congrès FIP. Londres 1978 (AFB/AFGC), pp. 181-186. (1978):
- Viaducs du contournement autoroutier de Nice. Presented at: La technique française du béton. 8ème congrès FIP. Londres 1978 (AFB/AFGC), pp. 172-180. (1978):
- About this
data sheet - Structure-ID
20004634 - Published on:
22/08/2002 - Last updated on:
30/07/2019