General Information
Project Type
Function / usage: |
Railroad (railway) tunnel |
---|---|
Structure: |
Tunnel |
Location
Location: |
Mürzzuschlag, Styria, Austria Gloggnitz, Lower Austria, Austria |
---|---|
Coordinates: | 47° 40' 33" N 15° 55' 20.70" E |
Coordinates: | 47° 36' 29.60" N 15° 41' 24" E |
Technical Information
Dimensions
length | 27.3 km | |
number of tubes | 2 |
Design Loads
design speed | 230 km/h |
Participants
Owner
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- The challenges of contract SBT1.1 "Tunnel Gloggnitz" / Die Herausforderungen des Bauloses SBT1.1 Tunnel Gloggnitz. In: Geomechanics and Tunnelling, v. 8, n. 6 ( 2015), pp. 554-567. (2015):
- Distributed Fiber Optic Sensing Applications at the Semmering Base Tunnel. In: Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction, v. 172, n. 4 (December 2019), pp. 1-13. (2019):
- Investigation Strategies for the Design of the Semmering Base Tunnel. In: Felsbau, v. 18, n. 4 ( 2000), pp. 28. (2000):
- The long path to approval of the Semmering Base Tunnel and the effect on construction progress / Der lange Weg zur Genehmigung des Semmering-Basistunnels und Auswirkungen auf den Bauablauf. In: Geomechanics and Tunnelling, v. 8, n. 6 ( 2015), pp. 547-553. (2015):
- Maintenance-optimised drainage system for the New Semmering Base tunnel and Pummersdorf Tunnel / Instandhaltungsoptimiertes Entwässerungssystem für den Semmering-Basistunnel neu und Tunnel Pummersdorf. In: Geomechanics and Tunnelling, v. 7, n. 5 ( 2014), pp. 626-635. (2014):
- About this
data sheet - Structure-ID
20059166 - Published on:
13/12/2010 - Last updated on:
25/07/2014