Maintenance-optimised drainage system for the New Semmering Base tunnel and Pummersdorf Tunnel / Instandhaltungsoptimiertes Entwässerungssystem für den Semmering-Basistunnel neu und Tunnel Pummersdorf
Author(s): |
Oliver K. Wagner
Daniel Koch Johann Lemmerer Hubert Druckfeuchter Thomas Petraschek |
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2014, n. 5, v. 7 |
Page(s): | 626-635 |
DOI: | 10.1002/geot.201400032 |
Abstract: |
In order to reduce operational interruptions for the maintenance of the drainage system, the ÖBB-Infrastruktur AG has developed an innovative drainage flushing system, which has different features depending on tunnel system and overburden. |
Keywords: |
tunnel drainage maintenance pressure relief
|
Available from: | Refer to publisher |