0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Tunnel Pummersdorf; Pummerdorfer Tunnel
Beginning of works: January 2012
Completion: 10 December 2017
Status: in use

Project Type

Structure: Tunnel
Function / usage: Railroad (railway) tunnel
Construction method: New Austrian Tunnelling Method (NATM)

Location

Location: , ,
Coordinates: 48° 10' 40.87" N    15° 36' 11.71" E
Coordinates: 48° 10' 48.20" N    15° 33' 25.86" E
Show coordinates on a map

Technical Information

Dimensions

total length 3 485 m
number of tracks 2
total excavated section ca. 120 m²
number of tubes 1
track gauge 1 435 mm
inner shell thickness 30 cm

Case Studies and Applied Products

Pummersdorf Tunnel: Closing a gap in one of Austria’s most important railway lines

Pummersdorf Tunnel: Closing a gap in one of Austria’s most important railway lines

Within the scope of the Westbahn extension, one of the most important railway lines in Austria, a 24.7 km long gap was closed between the towns of St. Pölten and Loosdorf. The new, double tracked line runs a ... [more]

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20066305
  • Published on:
    30/07/2014
  • Last updated on:
    07/04/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine