0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Riyadh Metro Orange Line Viaduct

General Information

Beginning of works: 2013
Completion: 2019
Status: in use

Project Type

Location

Location: ,
Part of:
Coordinates: 24° 37' 26.08" N    46° 42' 27.08" E
Coordinates: 24° 35' 38.17" N    46° 32' 51.58" E
Show coordinates on a map

Technical Information

Dimensions

main span 95 m
total length ca. 26 400 m
number of tracks 2
standard span lengths 37 m
track gauge 1 435 mm
deck deck width 10 m
bridge 1
span lengths 37 m - 50 m - 37 m
bridge 2
span lengths 59 m - 95 m - 59 m
bridge 3
span lengths 44 m - 73 m - 44 m

Materials

deck precast prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Participants

Design
Structural engineering

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20089960
  • Published on:
    09/12/2024
  • Last updated on:
    09/12/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine