0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Riyadh Metro Orange Line
Completion: 5 January 2025
Status: completed

Project Type

Location

Location: ,
Part of:

Technical Information

Dimensions

length 40.7 km
number of tracks 2
number of stations 22
elevated length 26.4 km
track gauge 1 435 mm

Excerpt from Wikipedia

The Orange Line (Arabic: المسار البرتقالي) or Line 3 is one of the six lines being developed in the Riyadh Metro network in Riyadh, Saudi Arabia. The line will run east–west along Al-Madinah Al Munawwarah and Prince Saad Bin Abdulrahman Al Awal Roads, starting in the west near Jeddah Expressway and ending in the east near the National Guard camp of Khashm El Aan. It will have 21 stations and 2 interchange stations, covering 40.7 km.

It will be mostly elevated along the western part of Al-Madinah Al Munawwarah Road, then underground in tunnels in the central section, and generally at grade along Prince Saad Bin Abdulrahman Road.

It was built by ArRiyadh New Mobility Consortium, a consortium of Webuild (at the time of signature), Impregilo, Bombardier, Ansaldo, Larsen & Toubro, Nesma & Partners, WorleyParsons.

Text imported from Wikipedia article "Line 3 (Riyadh Metro)" and modified on December 11, 2024 according to the CC-BY-SA 4.0 International license.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20089961
  • Published on:
    09/12/2024
  • Last updated on:
    09/12/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine