Author(s): |
María del Mar Mayo Martínez
|
---|---|
Medium: | conference paper |
Language(s): | English |
Conference: | VII Congreso de la Asociación Científico-Tecnica del Hormigón Estructural - Congreso Internacional de Estructuras, A Coruña, 20-22.06.2017 |
Year: | 2017 |
Abstract: | In Riyadh Line 3 elevated part there are eight Two Side Elevated Platform Stations, 3A1, 3A2, 3B1, 3C2, 3D2, 3D3, 3G1 y 3G2 and a Central Platform Station, 3D1. Station platforms are 14 m high with respect to landscape level, and all of them are parallel to the existent roads below them. Stations allow a double pedestrian flow, main purpose is for people to reach platform level to catch the train, but it also allow people to cross the roads, without access to Metro infrastructure, as a pedestrian bridge. |
Keywords: |
precast segmental bridge
|