General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Multi-span continuous girder bridge |
Construction method: |
Incremental launching |
Structure: |
Single-cell box girder bridge Haunched girder bridge |
Location
Location: |
Penig, Mittelsachsen, Saxony, Germany |
---|---|
Crosses: |
|
Coordinates: | 50° 55' 49.28" N 12° 41' 19.52" E |
Technical Information
Dimensions
total length | 710 m | |
bridge surface | 20 945 m³ | |
total width | 29.50 m | |
piles | diameter | 1.20 m |
Eastern bridge | ||
---|---|---|
span lengths | 43 m - 3 x 50 m - 60 m - 70 m - 100 m - 50 m - 55 m - 45 m - 2 x 48 m - 43 m | |
number of spans | 13 | |
Western bridge | ||
span lengths | 43 m - 3 x 50 m - 60 m - 70 m - 100 m - 50 m - 45 m - 55 m - 2 x 48 m - 43 m | |
number of spans | 13 |
Quantities
piles | total length of piles | 2 427 m |
substructure | concrete volume | 7 126 m³ |
reinforcing steel | 1 281 t | |
superstructure | concrete volume | 17 372 m³ |
prestressing steel | 717 t | |
reinforcing steel | 2 952 t |
Design Loads
design code(s) | DIN FB 101 |
Cost
cost of construction | Euro 30 200 000 |
Participants
Owner
Client
Design
Erection engineering
Soil investigation report
Checking engineering
-
Curbach Bösche Ingenieurpartner
- Manfred Curbach (checking engineer)
Contractor
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2013. Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany), 2014, pp. 25-38.
- About this
data sheet - Structure-ID
20066865 - Published on:
25/02/2015 - Last updated on:
04/06/2023