0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2004
Completion: 2007
Duration of works: 33 months
Status: in use

Project Type

Structure: Cable-stayed bridge with harp system
Function / usage: Road bridge
Material: Steel-concrete hybrid bridge
Structure: deck of approach viaduct:
Double T-section girder bridge
Material: deck of approach viaduct:
Prestressed concrete bridge
Secondary structure(s): Structurae Plus/Pro - Subscribe Now!
Material: main span:
Steel-reinforced concrete composite bridge

Location

Location: , ,
Crosses:
  • Elbe River
Coordinates: 50° 9' 56.55" N    15° 5' 23.19" E
Show coordinates on a map

Technical Information

Dimensions

main span 132 m
length 531.60 m
span lengths 35 m - 4 x 41 m - 132 m - 4 x 41 m - 35 m
number of spans 11

Participants

Design
Main contractor
Co-contractor
Steel construction
Material supplier
Expansion joints

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20031220
  • Published on:
    14/03/2008
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine