General Information
Completion: | 6 October 1965 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge Haunched girder bridge |
---|---|
Function / usage: |
Road bridge Tramway, light or metro rail bridge |
Material: |
Steel bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Magdeburg, Saxony-Anhalt, Germany |
---|---|
Address: | Ernst-Reuter-Allee |
Crosses: |
|
Coordinates: | 52° 7' 43.33" N 11° 38' 37.31" E |
Technical Information
Dimensions
total length | 257.70 m | |
span lengths | 81.2 m - 130.0 m - 46.5 m | |
number of spans | 3 | |
roadway / carriageway width | 18.0 m | |
deck | width | 30 m |
girder depth | 3.20 - 5.00 m |
Materials
superstructure |
steel
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Straßenbrücken über die Elbe. Eine Darstellung der historischen Entwicklung der Elbbrücken in Deutschland. 1st edition, Saxoprint GmbH, Dresden (Germany), pp. 116-123. (2005):
- About this
data sheet - Structure-ID
20079066 - Published on:
19/01/2020 - Last updated on:
19/01/2020