General Information
Other name(s): | Naabtalbrücke |
---|---|
Beginning of works: | 2000 |
Completion: | 2003 |
Duration of works: | 32 months |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Pfreimd, Schwandorf (Kreis), Bavaria, Germany |
---|---|
Crosses: |
|
Carries: |
|
Part of: | |
Coordinates: | 49° 31' 19.96" N 12° 10' 10.75" E |
Technical Information
Dimensions
number of spans | 10 | |
bridge surface | 14 765 m² | |
deck | width | > 32.0 m |
deck depth | 3.10 m | |
piles | diameter | 1.50 m |
southern branch | span lengths | 35.00 m - 30.50 m - 7 x 48.50 m - 39.50 m |
Northern bridge | ||
---|---|---|
total length | 444.50 m | |
span lengths | 37.50 m - 41.00 m - 7 x 48.50 m - 39.50 m | |
Southern bridge | ||
total length | 457.50 m |
Quantities
deck | concrete volume | 12 000 m³ |
prestressing steel | 505 t | |
reinforcing steel | 1 470 t | |
piles | total length of piles | 660 m |
Cost
cost of construction | Euro 11 500 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Owner
Client
Preparation of tender documents
Design
Alternative design
Structural engineering
Checking engineering
- Konrad Zilch (checking engineer)
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2005. Deutscher Bundes-Verlag, Berlin (Germany), 2005, pp. 21-33.
- Die Naabtalbrücke - Eine Taktschiebebrücke mit außergewöhnlichen Geometrien. In: Bauingenieur, v. 79, n. 3 (March 2004), pp. 128+. (2004):
- About this
data sheet - Structure-ID
20007725 - Published on:
11/01/2003 - Last updated on:
05/02/2016