General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Railroad (railway) tunnel |
Construction method: |
Tunnel boring machine (TBM) Cut-and-cover method |
Location
Location: |
Malmö, Skåne län, Sweden |
---|---|
Part of: | |
Connects to: |
Malmö C Underground Station (2010)
Triangeln Station (2010) |
Coordinates: | 55° 36' 36.42" N 13° 0' 14.52" E |
Coordinates: | 55° 34' 2.42" N 12° 59' 2.53" E |
Technical Information
Dimensions
tunnel length | 4 650 m | |
length of bored tunnels | 4 650 m | |
length of cut-and-cover section | 360 m | |
number of tubes | 2 | |
tube | interior diameter | 7.90 m |
excavation diameter | 8.95 m | |
exterior diameter | 8.60 m |
Chronology
4 December 2010 | Inauguration by King Carl Gustaf. |
---|
Notes
Two EPB (earth pressure balance) tunneling machines are used in construction.
Participants
Structural engineering
Co-contractor
Subcontractor
Material supplier
Formwork
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Auftriebssicherung mit GEWI® -Dauerankern für neue unterirdische Bahnstation. Citytunnel-Projekt, Malmö, Schweden. In: DSI Info, n. 15 ( 2007- 2008), pp. 30-32.
- Citytunnel Malmö C.S.. Herstellung einer trockenen Baugrube im ausgeprägt klüftigen Fels. In: Bautechnik, v. 85, n. 9 (September 2008), pp. 628-633. (2008):
- Gut kombiniert: Citytunnel Malmö. In: beton, v. 57, n. 1-2 ( 2007), pp. 35-36.
- Malmö City Tunnel, Schweden. In: Beton- und Stahlbetonbau, v. 105, n. 7 (July 2010), pp. 462.
- Der Malmö Citytunnel, Schweden - Tunnelbau in Skandinavien. In: Beton- und Stahlbetonbau, v. 103, n. 10 (October 2008), pp. 689-697. (2008):
- About this
data sheet - Structure-ID
20017494 - Published on:
22/08/2005 - Last updated on:
28/05/2021