0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2005
Completion: 4 December 2010
Duration of works: 52 months
Status: in use

Project Type

Function / usage: Railroad (railway) tunnel
Construction method: Tunnel boring machine (TBM)
Cut-and-cover method
Structure: Tunnel

Location

Location: , ,
Part of:
Connects to: Malmö C Underground Station (2010)
Triangeln Station (2010)
Coordinates: 55° 36' 36.42" N    13° 0' 14.52" E
Coordinates: 55° 34' 2.42" N    12° 59' 2.53" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 4 650 m
length of bored tunnels 4 650 m
length of cut-and-cover section 360 m
number of tubes 2
tube interior diameter 7.90 m
excavation diameter 8.95 m
exterior diameter 8.60 m

Chronology

4 December 2010

Inauguration by King Carl Gustaf.

Notes

Two EPB (earth pressure balance) tunneling machines are used in construction.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20017494
  • Published on:
    22/08/2005
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine