Media File No. 72743
ith the two PERI formwork carriages, the 15 m long casting segments are constructed very efficiently. Hydraulically-operated raise and lowering equipment ensure time and cost-saving moving procedures. The PERI construction can be continuously adapted to the varying cross-sectional dimensions
|
More media of this structure |