0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Media File No. 72743

ith the two PERI formwork carriages, the 15 m long casting segments are constructed very efficiently. Hydraulically-operated raise and lowering equipment ensure time and cost-saving moving procedures. The PERI construction can be continuously adapted to the varying cross-sectional dimensions

Media-ID: 72743
Author/Source:

PERI GmbH

Medium provided by: PERI, image used with kind permission.
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Published on:
Last updated on: 03/11/2006

More media of this structure

Sweden (2010)