0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Citytunneln
Beginning of works: 2005
Completion: 4 December 2010
Status: in use

Project Type

Function / usage: Railroad (railway) line

Location

km Name
Show coordinates on a map

Technical Information

Dimensions

total length 17 km
number of tracks 2

Participants

Structural engineering
Subcontractor
Material supplier

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    10000775
  • Published on:
    22/08/2005
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine