0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Masan Bay Bridge; Masan Changwon Bridge
Beginning of works: April 2004
Completion: 24 June 2008
Status: in use

Project Type

Location

Location: ,
,
Coordinates: 35° 9' 47" N    128° 35' 37.72" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 700 m
approach viaduct 1
total length 410 m
approach viaduct 2
total length 550 m
main bridge
main span 450 m
total length 740 m
pylons height 165 m

Cost

cost of construction South Korean won 320 000 000 000

Materials

deck steel
piers reinforced concrete
pylons reinforced concrete
reinforced concrete

Case Studies and Applied Products

TENSA®MODULAR LR & LR-LS – Modular expansion joints

TENSA®MODULAR LR & LR-LS – Modular expansion joints

Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions and rotations around all 3 axes.

[more]

Relevant Web Sites

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20032342
  • Published on:
    19/10/2007
  • Last updated on:
    18/02/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine