0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2005
Completion: 2007
Status: in use

Project Type

Function / usage: High-speed rail bridge
Structure: Girder bridge
Material: Steel-reinforced concrete composite bridge
Construction method: main bridge:
Incremental launching
approach viaduct:
Movable Scaffolding System

Location

Location: , , ,
, , ,
Crosses:
  • Llobregat River
Part of:
Coordinates: 41° 21' 1.08" N    2° 3' 15.37" E
Show coordinates on a map

Technical Information

Dimensions

approach viaduct
main span 50 m
main bridge
span lengths 44 m - 4 x 63 m - 44 m
number of spans 6

Cost

cost of construction Euro 88 300 000

Materials

deck of main bridge composite steel-reinforced concrete
deck of approach viaduct prestressed concrete

Participants

Structural engineering

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20025643
  • Published on:
    10/12/2006
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine