General Information
Project Type
Structure: |
Deck arch bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Cantilever construction using temporary cable-stays |
Material: |
Reinforced concrete bridge |
Location
Location: |
Skradin, Šibenik-Knin, Croatia |
---|---|
Crosses: |
|
Part of: | |
Coordinates: | 43° 48' 29" N 15° 54' 56" E |
Technical Information
Dimensions
total length | 391 m | |
arch | rise | 52 m |
arch span | 204 m | |
deck | width | 22.56 m |
span lengths | 4 x 32 m - 3 x 28 m - 3 x 32 m - 28 m - 24 m | |
number of spans | 12 |
Quantities
structural steel | 1 700 t | |
concrete volume | 12 000 m³ |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
arch |
reinforced concrete
|
Case Studies and Applied Products
TENSA®MODULAR LR & LR-LS – Modular expansion joints
Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions and rotations around all 3 axes.
[more]Participants
Relevant Web Sites
Relevant Publications
- DYWIDAG-Hilfsabspannungen sichern Bau der Krka-Bogenbrücke. Autobahnbrücke über den Fluss Krka, Autobahn Zagreb - Split. In: DSI Info, n. 13 ( 2005- 2006), pp. 20.
- Krka-Bogenbrücke in Kroatien setzt optische Akzente. In: Beton- und Stahlbetonbau, v. 99, n. 4 (April 2004), pp. 303.
- Temporary DYWIDAG Suspension Cables secure Construction of the Krka Arch-Bridge. Highway Bridge over the Krka River, Highway Zagreb-Split. In: DSI Info, n. 13 ( 2005- 2006), pp. 20.
- Two Notable Arch Bridges on The Croatian Adriatic Highway. In: Structural Engineering International, v. 20, n. 1 (February 2010), pp. 36-40. (2010):
- About this
data sheet - Structure-ID
20014275 - Published on:
06/11/2004 - Last updated on:
05/02/2016