General Information
Other name(s): | Koralm Railway |
---|---|
Beginning of works: | 20 March 2009 |
Completion: | 2023 |
Status: | in use/under construction |
Project Type
Function / usage: |
Railroad (railway) line |
---|
Location
km | Name |
Technical Information
Dimensions
total length | 127 km |
Design Loads
design speed | 250 km/h |
Participants
Owner
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Current state of design and construction for the St. Kanzian tunnel chain / Aktueller Planungs- und Ausführungsstand der Tunnelkette St. Kanzian. In: Geomechanics and Tunnelling, v. 8, n. 6 ( 2015), pp. 535-546. (2015):
- The Granitztal Tunnel Chain - State of works on the second longest tunnel system on the Koralmbahn / Tunnelkette Granitztal - Stand der Arbeiten für das zweitlängste Tunnelsystem an der Koralmbahn. In: Geomechanics and Tunnelling, v. 9, n. 5 ( 2016), pp. 416-427. (2016):
- Koralm railway - Lavant valley preparatory measures / Koralmbahn - vorbereitende Maßnahmen Lavanttal. In: Geomechanics and Tunnelling, v. 2, n. 6 ( 2009), pp. 767-768.
- Koralm Railway Tunnel. In: (2008): The Austrian Art of Tunnelling. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wisenschaften GmBH und Co. KG, Berlin (Germany), ISBN 978-3-433-02924-4, pp. 54-56. (2008):
- Koralm Railway Tunnel, Exploratory Tunnel Paierdorf, Austria. In: DSI Info, n. 15 ( 2007- 2008), pp. 90-91.
- About this
data sheet - Structure-ID
20070631 - Published on:
02/02/2016 - Last updated on:
28/05/2021