General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Railroad (railway) tunnel |
Construction method: |
Drilling and blasting New Austrian Tunnelling Method (NATM) Cut-and-cover method Wall-cover construction method Excavation by excavator |
Location
Location: |
Hengsberg, Styria, Austria Weitendorf, Styria, Austria |
---|---|
Part of: |
|
Coordinates: | 46° 52' 44" N 15° 28' 9" E |
Coordinates: | 46° 51' 55" N 15° 27' 36" E |
Technical Information
Dimensions
length | 1 695 m | |
number of tracks | 2 | |
tunnel section area | 120 m² | |
length of cut-and-cover section | 210 m |
Cost
cost of construction | Euro 74 000 000 |
Materials
inner shell |
fiber reinforced concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.