0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: Summer 2016
Status: project phase

Project Type

Structure: Tunnel
Function / usage: Railroad (railway) tunnel
Construction method: Wall-cover construction method
Cut-and-cover method

Location

Location: , ,
Part of:
Coordinates: 46° 37' 34.38" N    14° 34' 39.17" E
Coordinates: 46° 37' 33.79" N    14° 35' 25.90" E
Show coordinates on a map

Technical Information

Dimensions

length 665 m
number of tracks 2 x 1
length of bored tunnels 617 m

Participants

Owner
Structural engineering

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20070628
  • Published on:
    02/02/2016
  • Last updated on:
    02/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine