0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Results from the Untersammelsdorf test field for the planning of tunnelling work / Erkenntnisse aus dem Versuchsfeld Untersammelsdorf für die Gestaltung der Vortriebsmaßnahmen

Author(s):


Medium: journal article
Language(s): English, German
Published in: Geomechanics and Tunnelling, , n. 2, v. 3
Page(s): 201-214
DOI: 10.1002/geot.201000017
Abstract:

In the western part of the Koralmbahn railway line, tests were carried out as part of planned specialised civil engineering works in silty to sandy still water sediments in order to find out about the interaction of jet grouting and dewatering measures with this ground, which is considered to be as geotechnically relatively unfavourable. Small-scale tunnelling work was also carried out to gain experience for the later tunnel construction work in this area. The most important discoveries were: that the jet grouting trials achieved jet grout columns with a diameter of 1.5 m within the still water sediments; and the simulation of a tunnel drive was able to demonstrate that stable conditions at the face can be achieved with the chosen advance support measures. The evaluated results made it possible to optimise the design of the tunnel structures and the forecast performance rates for the grouting works.

Keywords:
field tests still water sediments jet grouting dewatering measures
Available from: Refer to publisher

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/geot.201000017.
  • About this
    data sheet
  • Reference-ID
    10063785
  • Published on:
    19/11/2010
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine