General Information
Beginning of works: | Spring 2016 |
---|---|
Status: | project phase |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Railroad (railway) tunnel |
Construction method: |
Cut-and-cover method |
Location
Location: |
Sankt Kanzian am Klopeiner See, Carinthia, Austria |
---|---|
Part of: |
|
Coordinates: | 46° 36' 45.64" N 14° 32' 8.85" E |
Coordinates: | 46° 37' 23.26" N 14° 33' 56.10" E |
Technical Information
Dimensions
total length | 2 100 m | |
number of tracks | 2 x 1 | |
length of bored tunnels | 1 535 m | |
length of cut-and-cover section | 565 m |
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Current state of design and construction for the St. Kanzian tunnel chain / Aktueller Planungs- und Ausführungsstand der Tunnelkette St. Kanzian. In: Geomechanics and Tunnelling, v. 8, n. 6 ( 2015), pp. 535-546. (2015):
- About this
data sheet - Structure-ID
20070629 - Published on:
02/02/2016 - Last updated on:
02/02/2016