General Information
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
High-speed rail bridge |
Construction method: |
Incremental launching |
Structure: |
Deck arch bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Langewiesen, Ilm-Kreis, Thuringia, Germany |
---|---|
Crosses: |
|
Part of: |
|
Coordinates: | 50° 40' 12.55" N 10° 59' 22.01" E |
Technical Information
Dimensions
main span | 175 m | |
total length | 1 681 m | |
height above valley floor or water | 45 m | |
arch Mitte | rise | ca. 40 m |
arch span | 155 m | |
arch Nord | rise | 37.50 m |
arch span | 175 m | |
arch Süd | rise | 31 m |
arch span | 125 m | |
deck | width | 14.1 m |
girder depth | 5.0 m |
Cost
cost of construction | Euro 29 200 000 |
Materials
deck |
prestressed concrete
|
---|
Chronology
10 December 2017 | Opened to traffic along with the entire high-speed rail line from Nuremberg to Erfurt. |
---|
Participants
Owner
Owner's representative
Original design
Alternative design
Structural engineering
Checking engineering
- Hans-Peter Andrä (checking engineer)
Contractor
Bearings
Expansion joints
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Mit Hochgeschwindigkeit über das Ilmtal. In: Brückenbau, v. 1, n. 4-1 ( 2009- 2010), pp. 48. (2009):
- About this
data sheet - Structure-ID
20032726 - Published on:
31/10/2007 - Last updated on:
07/12/2017