Advertisement
Horotiu Paa Bridge
General Information
Other name(s): | Karapiro Gully Viaduct |
---|---|
Completion: | 2016 |
Status: | in use |
Project Type
Structure: |
Haunched girder bridge Quadruple girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel-prestressed concrete composite bridge |
Location
Location: |
Cambridge, Waikato, New Zealand |
---|---|
Part of: | |
Coordinates: | 37° 53' 17.51" S 175° 29' 44.48" E |
Technical Information
Dimensions
total length | ca. 200 m | |
number of spans | 4 | |
height above valley floor or water | 40 m | |
girder depth | 1.8 - 3.2 m | |
number of lanes | 2 × 2 |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
precast prestressed concrete
|
abutments |
reinforced concrete
|
girders |
Weathering steel
|
Products, Services & Reports

mageba elastomeric bearings, which conform to various international standards, such as the EN1337, DIN4141, BS5400 and AASHTO, are used globally fo ...
[more]
mageba Pot Bearings are durable bearings that can be used in many situations, whether in big or small bridges, or a variety of engineering structur ...
[more]Participants
Owner
Structural engineering
Contractor
Bearings
Relevant Web Sites
Relevant Publications
- Design Challenges of the Horotiu Paa Bridge - Maximising Structural Efficiency and Economy. Presented at: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, 19th IABSE Congress Stockholm, 21-23 September 2016, pp. 814-823. (2016):
- About this
data sheet - Structure-ID
20066784 - Date created
05/02/2015 - Last Update
10/02/2017