General Information
Name in local language: | Neckartalbrücke Heilbronn; Neckartalbrücke Neckarsulm |
---|---|
Other name(s): | Neckarsulm Viaduct |
Beginning of works: | 1965 |
Completion: | 1967 |
Status: | demolished (2019) |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
bridge 1: Prestressed concrete bridge |
Structure: |
bridge 1: Box girder bridge bridge 1: Haunched girder bridge bridge 3: Box girder bridge |
Material: |
bridge 3: Steel bridge bridge 2: Prestressed concrete bridge |
Construction method: |
bridge 2: Span-by-span in-situ casting on falsework |
Demolition method: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
bridge 2: Double T-section girder bridge bridge 4: Box girder bridge |
Material: |
bridge 4: Prestressed concrete bridge |
Support conditions: |
for registered users |
Location
Location: |
Neckarsulm, Heilbronn (Kreis), Baden-Württemberg, Germany Heilbronn, Baden-Württemberg, Germany |
---|---|
Crossed: |
|
Carried: |
|
Part of: | |
Replaced by: |
Heilbronn Viaduct (A6) (2022)
|
Coordinates: | 49° 11' 2.86" N 9° 12' 57.08" E |
Technical Information
Dimensions
total length | 1 326 m | |
standard span lengths | 36 m | |
deck | deck depth | 3.00 m |
deck width | 30.00 m | |
bridge 1 (Neckardurchstich) | ||
---|---|---|
total length | 311 m | |
span lengths | 80 m - 151 m - 80 m | |
number of spans | 3 | |
deck | deck depth | 4.2 - 7.45 m |
bridge 2 | ||
total length | 585 m | |
standard span lengths | 39 m | |
deck | deck depth | 3.0 m |
deck width | 29.8 m | |
on-center distance between girders | 16.25 m | |
bridge 3 (Neckarbrücke) | ||
total length | 260 m | |
span lengths | 138 m - 122 m | |
number of spans | 2 | |
bridge 4 | ||
total length | 160 m | |
span lengths | 40 m - 2 x 44 m - 37 m | |
number of spans | 4 | |
deck | deck depth | 2.10 m |
Materials
piers |
reinforced concrete
|
---|---|
abutments |
reinforced concrete
|
deck of bridge 1 |
prestressed concrete
|
deck of bridge 2 |
prestressed concrete
|
deck of bridge 3 |
steel
|
deck of bridge 4 |
prestressed concrete
|
Participants
Initial construction (1965-1967)
Owner
Client
Demolition (2019-2020)
Owner
Checking engineering
- Roland Wetzel (checking engineer)
- Tilll Würfel (checking engineer)
- Michael Gleisle (checking engineer)
Demolition engineering
Demolition contractor
Relevant Web Sites
Relevant Publications
- Abbruch des Neckartalübergangs der A 6. Durchführung von vier unterschiedlichen Techniken. In: Brückenbau, v. 12, n. 1-2 ( 2020), pp. 131-137. (2020):
- Brücken / Bridges. Ästhetik und Gestaltung / Aesthetics and Design. 4th edition, Deutsche Verlags-Anstalt, Stuttgart (Germany), pp. 142. (1994):
- About this
data sheet - Structure-ID
20004999 - Published on:
15/09/2002 - Last updated on:
26/01/2022