General Information
Project Type
Structure: |
Tied-arch bridge |
---|---|
Function / usage: |
Railroad (railway) bridge |
Structure: |
Through truss bridge Warren type truss bridge Continuous truss bridge |
Material: |
Steel bridge |
Location
Location: |
Düsseldorf-Hamm, Düsseldorf, North Rhine-Westphalia, Germany |
---|---|
Crosses: |
|
Replaces: |
Düsseldorf-Hamm Bridge (1912)
|
Coordinates: | 51° 12' 30" N 6° 43' 49" E |
Technical Information
Dimensions
main spans | 250 m - 135 m | |
number of tracks | 4 |
Materials
arch |
steel
|
---|---|
truss |
steel
|
Participants
Owner
Structural engineering
- Dyckerhoff & Widmann AG (concrete)
- Hein, Lehmann AG (steel)
Civil works
Steel construction
approach viaduct
Design
main bridge
Original design
Alternative design
Checking engineering
-
Ruhrberg Ingenieurgemeinschaft
(substructure)
- Reinhard Ruhrberg (checking engineer)
- Hans Schumann (checking engineer)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Architekten und Ingenieure gestalten ihre Stadt. 100 Jahre Architekten- und Ingenieurverein (AIV). Richter-Verlag, Düsseldorf (Germany), 1993, pp. 115-117.
- Construction and Erection of the Rhine Bridge at Dusseldorf-Neuss. In: Structural Engineering International, v. 2, n. 1 (February 1992), pp. 28-33. (1992):
- Düsseldorf: eine Stadt zwischen Tradition und Vision. Brücken über den Rhein. B.o.s. Druck und Medien, Kleve (Germany), pp. 322. (2001):
- Messungen am Stahlüberbau der neuen Hammer Eisenbahnbrücke anläßlich von Belastungsversuchen. In: Stahlbau, v. 62, n. 2 (February 1993), pp. 43-56. (1993):
- Planung eines viergleisigen Eisenbahnbrückenzuges bei Düsseldorf-Hamm für die Ost-West-S-Bahn. In: Stahlbau, v. 49, n. 9 (September 1980), pp. 257-261. (1980):
- About this
data sheet - Structure-ID
20000330 - Published on:
07/08/1999 - Last updated on:
07/03/2022