Planung eines viergleisigen Eisenbahnbrückenzuges bei Düsseldorf-Hamm für die Ost-West-S-Bahn
Author(s): |
E. Hansen
|
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Stahlbau, September 1980, n. 9, v. 49 |
Page(s): | 257-261 |
Keywords: |
steel bridge construction railroad bridges rail bridges detailed design cost comparison
|
Available from: | Refer to publisher |