General Information
Completion: | 1992 |
---|---|
Status: | in use |
Project Type
Function / usage: |
High-speed rail bridge |
---|---|
Construction method: |
Precast segmental construction using launching gantry |
Material: |
Prestressed concrete bridge |
Structure: |
Box girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Ciudad Real, Ciudad Real, Castile-La Mancha, Spain Carrión de Calatrava, Ciudad Real, Castile-La Mancha, Spain |
---|---|
Crosses: |
|
Part of: | |
Replaces: |
Old Guadiana River Rail Bridge (1927)
|
Coordinates: | 39° 3' 36.17" N 3° 54' 27.93" W |
Technical Information
Dimensions
total length | 292 m | |
span lengths | 42 m - 4 x 52 m - 42 m | |
number of spans | 6 | |
number of tracks | 2 | |
piers | diameter | 2.0 m |
piles | diameter | 1.0 m |
superstructure | deck width | 11.60 m |
girder depth | 4.0 m |
Materials
superstructure |
precast prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Ultimos puentes construidos por Ferrovial con dovelas prefabricadas. In: Hormigón y acero, v. 42, n. 179 (2nd Quarter 1991), pp. 129-133. (1991):
- About this
data sheet - Structure-ID
20076903 - Published on:
27/02/2019 - Last updated on:
27/02/2019