General Information
Completion: | 2015 |
---|---|
Status: | in use |
Project Type
Function / usage: |
High-speed rail bridge |
---|---|
Material: |
Prestressed concrete bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Material hybrid bridge |
Structure: |
Multi-span continuous girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
main span: Bowstring-arch-truss bridge |
Material: |
main span: Steel-reinforced concrete composite bridge |
Location
Location: |
Antequera, Málaga, Andalusia, Spain |
---|---|
Part of: | |
Coordinates: | 37° 3' 30.95" N 4° 30' 53.63" W |
Coordinates: | 37° 4' 38.93" N 4° 30' 1.34" W |
Coordinates: | 37° 4' 16.54" N 4° 30' 31.23" W |
Technical Information
Dimensions
total length | 2 525.50 m | |
span lengths | 39.00 m - 27 x 51.25 m - 4 x 51.25 m - 90.00 m - 18 x 51.25 m - 39.00 m | |
number of spans | 52 | |
number of tracks | 2 | |
track gauge | 1 435 mm | |
abutments | number | 2 |
deck | deck depth | 3.40 m |
deck width | 14.00 m | |
pier P25 | height | 28.146 m |
piers | number | 48 |
maximum height | 27 m | |
piers P1-P24, P26-P28, P31-P48 | width | 4.50 m |
thickness | 3.00 m | |
piers P29-P30 | height | 23.00 m |
piles | diameter | 1.80 m |
main span | ||
---|---|---|
total width | 18.40 m | |
arches | width | 1.50 m |
rise | 17.00 m | |
depth | 1.50 m | |
deck | deck depth | 3.40 m |
Quantities
structural steel | 1 590 t | |
concrete volume | 64 530 m³ | |
prestressing steel | 1 280 t | |
reinforcing steel | 14 308 t |
Cost
cost of construction | Euro 65 000 000 |
Materials
piers |
reinforced concrete
|
---|---|
arches |
steel
|
abutments |
reinforced concrete
|
Participants
Owner
Structural design
Contractor
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2014): Viaduct over Guadalhorce River and A-92 Highway. Presented at: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014, pp. 2132-2139.
- Viaduct over Guadalhorce River and A-92 Highway, Málaga, Spain. In: Structural Engineering International, v. 24, n. 1 (February 2014), pp. 105-110. (2014):
- About this
data sheet - Structure-ID
20086844 - Published on:
08/09/2023 - Last updated on:
08/09/2023