Viaduct over Guadalhorce River and A-92 Highway

 Viaduct over Guadalhorce River and A-92 Highway
Author(s): , , , ,
Presented at IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014, published in , pp. 2132-2139
DOI: 10.2749/222137814814068634
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.14 MB

The Guadalhorce Viaduct, built as part of the high-speed line Antequera-Peña de los Enamorados (south Spain), has a length of 2525,50 m and consists of 49 spans of 51,25 m length each. It is one o...
Read more

Bibliographic Details

Author(s):





Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014
Published in:
Page(s): 2132-2139 Total no. of pages: 8
Page(s): 2132-2139
Total no. of pages: 8
Year: 2014
DOI: 10.2749/222137814814068634
Abstract:

The Guadalhorce Viaduct, built as part of the high-speed line Antequera-Peña de los Enamorados (south Spain), has a length of 2525,50 m and consists of 49 spans of 51,25 m length each. It is one of the longest bridges of its type in the country and is situated in a medium risk seismic zone. The superstructure consists of a continuous single-cell post-tensioned box-girder of 3,40 m depth. The main span, which crosses the A-92 Highway, is 90 m long and is reinforced by two steel tied arches. This span, along with its backward and forward spans, was resolved with a steel–concrete composite box-girder with a constant depth of 3,40 m. A point of fixity is materialized in a delta- shaped post-tensioned concrete pier located in an intermediate area of the bridge in order to meet the friction, braking, and seismic longitudinal forces induced by the large length of the viaduct. Hence, expansion joints are placed at both abutments. Span-by-span erection is being followed by means of two self-launching formwork gantries working simultaneously, starting from each abutment, and moving toward the delta-shaped pier. Temporary fixed points were required during the erection process and set at the piers placed just before the gantry. The viaduct is currently under construction.

Keywords:
post-tensioned box-girder steel tied arch temporary fix point self-launching gantry delta-shaped pier